08 8633 2203 manager@portfc.com.au

Oval Redevelopment

Apr 28, 2008 | 2008, Sports Oval | 0 comments

The Oval was laser levelled in October 2005 and four turf pitches added at the same time. The oval was top dressed with 1540 cubic metres of drift sand. It took 12 months for most of the grass to grow back.

 

Oval1
 Oval2
 Oval3
 Oval4
 Oval5
 Oval6
 Oval7
 Oval8
 Oval9
 Oval10